Loading the page
The Villeperrot and Champfleury dams are among the dams equipped with manual fish passes that make up the VNF network. They consist of a flap gate fish pass and a spillway with chain-operated gates. Our teams are responsible for the hydraulic, geotechnical and civil engineering design, the morphology of the waterways, and the management of the consortium comprising SYT (architect), OTEIS (fish pass) and EMI (valve manufacturer). They support the project through to the construction management and commissioning of the structures. The objectives of the reconstruction of these sites are to:
In this comprehensive project management operation, BRL Ingénierie is responsible for the following tasks: