Project
description
UNIDO has entrusted BRL Ingénierie with the detailed design of hydroelectric power plants for two sites in Burundi: Gikuka (2 MW), Makamba province & Waga (0.6 MW), Mwaro province.
Missions
& Services
Tasks performed include:
- Detailed topographical surveys for each site;
- Geotechnical investigations for each site;
- Feasibility study for the 2 sites;
- Detailed studies for the 2 sites.
Contact
Send a message