BRLI logo
Flagship projects

Balassa hydroelectric scheme

Feasibility study and APS

AfriqueGuineaBalassa site on the Senegal River

Project
description

The watersheds of the rivers originating from the Fouta-Djallon Massif in northern Guinea, tributaries of the Senegal River, benefit from abundant rainfall and harbor interesting hydroelectric potential. With this in mind, the OMVS High Commission requested a technical feasibility and preliminary design study for the Balassa multi-purpose dam project. The assignment was carried out in partnership with HATCH (Canada).

Missions
& Services

Tasks performed include:

  • Feasibility study ;
  • Preliminary Project Summary (PPS) ;
  • Environmental and Social Impact Assessment (ESIA) and Framework Resettlement Plan (FRP);
  • Training for OMVS personnel
Flagship projects

Contact

Send a message